Mobility

  • We conduct technical studies and generate alerts and proposals to optimize the results related to mobility indicators for passengers and freight.

 

We follow-up and monitor mobility and transportation projects as well as expansion works for the airport.  Furthermore, we promote knowledge, we conduct surveys and technical studies and generate alerts and proposals for institutions to optimize the results of Bogotá's indicators in terms of mobility and transportation projects.

Review the surveys and studies carried out about infrastructure and valuation works in Bogotá, road concessions, tracking and monitoring reports on Phase III of Transmilenio and surveys made about the El Dorado Airport.

Valuation works
Road concessions
Tracking and monitoring reports on Phase III of Transmilenio
Memories from the event: First Subway Line (2014)
Memories on Infraestructure with Road Safety
Surveys about the Airport El Dorado
You may be interested
Español Link